Showing posts with label Baby I.Q. Afghan. Show all posts
Showing posts with label Baby I.Q. Afghan. Show all posts

Thursday, April 03, 2008

Bad Moods

I am just in a bad mood. It seems like everything and everyone is on a mission to screw with me today. Ever have those days? Everything is just getting on my nerves. It's either because I'm really tired (my little man is going through a growth spurt and isn't sleeping well plus allergies make it hard for him to breathe) or my allergies are acting up (always a possibility) or it's just time for me to be in a bad mood, since I really don't have them that often. I am SO ready to start really getting up someone else's nose today.

I have, on the bright side, been finishing things right and left. I finished the Baby I.Q. Afghan (all but weaving in ends), and the body of Sheldon. I also organized my recipes. I find a stack here and there that need organizing, but it's all a process. It's supposed to rain this weekend, so I think I'm going to spend Saturday doing a few things in the house, rather than in the yard. I hope to start a couple of more projects this month, and get a few things finished as well. Here are the goals for April:

1. Finish Sheldon completely and give to recipient.
2. Complete toe-up double knitted socks and write down instructions.
3. Start on gloves for my brother
4. Start on socks for either my brother or sister-in-love. :)
5. Get desk/front room organized.

It doesn't look like a very long list, but trust me, it will keep me VERY busy this month. We're heading up to Toccoa next weekend to visit the in-laws. Hopefully I'll have some knitting time in the car to and from, so I can make some serious progress on some of the above items. I need to get the front room organized, so I can block my Clapotis. It's great as a scarf right now, but it could really use some blocking so I can wear it as a wrap.

Monday, March 31, 2008

Finishpalooza

I'm trying to have a finishpalooza, and if I would stop starting new projects, I could probably get more done. I did finish Clapotis this weekend (although it could use blocking and I have blocking pins downstairs somewhere in the abyss that is the craft room, the spare bedroom floor isn't in the condition necessary to block anything, so I'm stuck just wearing it unblocked and I LURVE it), and I have to say, I LOVE this pattern. I can definitely see why it was such a hit about 3 years ago. Again, sometimes I'm a little slow on the uptake. I hope to knit this one again in a red/black/grey colorway to the pattern specs, rather than making it longer and narrower than the original.

Tonight I'm hoping to finish the edging on JHAC's Baby I.Q. Afghan tonight, and then there will just be the sewing in ends part. That takes what feels like forever, but it has to be done. After that, I need to finish Sheldon (the newest Knit Night project).

I'm trying to be good and purchase more yarn or start a new project...but I did purchase a new book this weekend! I found a copy of Knitting Without Tears on the shelf (this NEVER happens...it's always an ordered book! - at least for me it is. I never luck into these things). So I definitely picked it up. I am coming into the EZ love ring. :) Once I can find Knitting Workshop (I'm thinking I'm going to hit my LYS up for this one...I think Debi carries it regularly, and doesn't have to order it). I know I've seen the DVD there, so I'm pretty sure she has the book too. I also picked up the latest Interweave Knits. I haven't looked at it in detail (I just skimmed it when I got home on Saturday) but I'm kind of "eh" on the changes. I do miss the lack of men's patterns. Of course, since I have so many men to knit for, I like to have options.

Wednesday, March 26, 2008

Evil Baking Genius

I was evil...and I did bake. The genius part, well, that's up for debate. I took Chocolate Toffee Bars to Knit Night last night, and I only brought home 3. My hubby finished those off. I don't think it was too bad. :)

In knitting, I'm chugging along on my Clapotis, and I'm over halfway done. I was hoping to have it finished by Easter (and my birthday), but that just didn't happen. Nonetheless, it's still in progress. I STILL haven't finished the Baby I.Q. Afghan (I'm close, but no cigar) and I still have to sew on snaps to the Classic Cardigan. Sheldon isn't moving very far either. And here I am, starting a new project. I'm toying with double knit socks...knitting both socks at the same time, one inside the other, from the toe up. I figured out how they HAVE to start, and now it's just a matter of getting the toddler socks completed, directions written up and test-knitted. I think I can find some test knitters for that. That's all for now...I'm going to grab a pattern and get started on those socks.

Wednesday, February 27, 2008

Organization

It's killing me...I think for the rest of the week I'm spending every waking moment possible downstairs cleaning, throwing away and organizing. I can never find what I need when I need it. I spent a good 30 minutes this morning looking for some yarn (found), a coupon book (not found) and a tape (not found). This is distressing.

I've almost finished the edging on the Baby I.Q. Afghan; there's about 1 square left to DC around in white, and then it's time to SC around the whole thing in black. In my search this morning, I did find 2 more skeins of black and another skein of white. I also found a skein of sock yarn that I knew I had, but couldn't find. I cannot remember the type of sock yarn that it is, only that it was on sale because it was the last one of its dye lot, and I bought it to make a pair of children's socks. Since I now have a child, it looks like he's getting a new pair of socks. It's a multi-colored bright sock yarn...and that's about all I can remember. I remember I bought it from the Yarn Garden in Lawrenceville, and it was on sale. It's pretty...and bright...it will do well for socks for either a boy or a girl, so I think I'm good to go.

Monday, February 25, 2008

Soooo close

I went Thursday night, in the pouring rain, to find buttons. I found none. Friday, I went searching for buttons online, and found some. I have yet to order them, but will probably tonight. Here's a picture of the (almost) finished cardigan:

This weekend, I also made these:
You can find the recipe here. I also made these:

The recipe is here. I highly recommend any of the recipes from the site that you find. I haven't tried all of them, but I have tried a few, and all of them turn out fantastic. This roll looks a little over done, but it tastes fine. I baked the rest of them about 5 minutes less, and they looked better and were a little less golden on top. I've tried the lasagna, rolls, cinnamon rolls, a version of the chicken spaghetti, and all of it has turned out fantastic. I get great complements from all the recipes. Go check out The Pioneer Woman (her main site) too. It's fun to read about life on a ranch, and her many crazy adventures, being a middle child and all.

I finally moved my sewing machine upstairs, but I couldn't find the cord! No electricity = no sewing on the machine. I did however, seam this together:

I also washed and dried some fabric, and will hopefully be able to post pictures of that later. Tonight is a major working night...I have a Finance Committee meeting tonight, and that means I won't be getting home until late. Tomorrow is Knit Night, and I'm going to that as well. I haven't been in about a month, and I need a break. It's so nice to get out every once in a while and be with adults but not have to work, or grocery shopping, or doing something involving children. Sometimes you just need an escape. I definitely need an escape this week.

Friday, January 25, 2008

Seaming

I started to seam the Baby I.Q. Afghan last night. I think part of my problem with my son's afghan is that I didn't catch the entire top loop of the stitches. I think that will help tremendously in stopping the holes. That, plus doubling up on the seams in the corners. All this I plan on incorporating into the new one, and then returning to my son's afghan and fixing the problems with it. The first 2 I did I didn't have this problem, mainly because I was more into seaming them than I was his or this one. I am rushing to get it done, rather than trying to do my best. We can fix that.

Wednesday, January 23, 2008

More Progress

I finished all the squares for the Baby I.Q. Afghan. Now for the seaming. I'm going to try seaming 4 squares at once instead of just 2 at a time. I'm also going to pass back through the corners to double the seam and hopefully it won't have holes.

I picked up my second Sheldon again this week, after finishing all the squares for the afghan. I'm over halfway done with his body, which is nice. I'll have to pull up some fiberfill for it later this week, or at least by Saturday. I'm somewhere in the 60s for rounds, and you stuff it in round 80. Since they are short rounds, it won't take long.

I have also made progress on the Classic Cardigan for my son by Debbie Bliss. Knit Night at TWNY helps TREMENDOUSLY. I love hanging out with the folks over there...it's fun to listen and see what others are doing. I must say, sometimes it's rather disheartening to see people only making a scarf or a hat out of plain yarn with no pattern to it. I kow the important thing is that they're knitting, but to always see scarves is just...boring to me. I hear and see such great projects online that others are doing, and I go, hoping that someone will astonish me with their mad knitting skilz. It just hasn't happened yet. Maybe before the end of the year, it will. Or, maybe I'll be that Crazy Mad Knitter and become a knitting goddess before too long. It all depends on how soon I finish some other projects.

I'm having committment issues with my projects. I'm trying to finish all of them, and want to pick all of them up and finish them all right now. I'm trying to prioritize, but let's face it...there are only self-imposed deadlines on many of these projects. I'll keep plugging away at them, little by little. Slowly and steadily, they'll all get done.

Monday, January 21, 2008

This weekend's progress

I did make progress this weekend on something...but it was crochet. Here are some (gasp!) pictures:



And I also finally repaired my son's afghan:



I hope to finish the green afghan this week...hopefully today I'll finish all the squares. Then comes the seaming...which I have to find a better way to seam. That's the problem with my son's afghan is just the seams. Oh well...oh, and I updated my Ravelry site as well. I'm getting better at this. Maybe I'll finish stuff and get things together before the year is over!

Monday, December 03, 2007

Progress...but not where it should be

Well, I made progress, but it's all on Baudelaire. I did NOTHING on the Baby I.Q. Afghan this weekend. I didn't even repair my baby's afghan. Most of the weekend, I was incapacitated due to a front moving through. I am the local barometer for the area apparently. Between the killer headache and nausea, I spent most of Saturday in bed. Sunday I finally got up and was able to do a few things, mostly get ready for the Children's Choir Christmas program we had at church last night. It was short, but went fairly well. It wasn't bad for a first year program. I'm hoping next year will be more involved, and we did manage to pack the chapel at church. If we do a bigger program next year, we may need the sanctuary. In any case, I'm hoping to do something on the afghans today. Or I'll finish the first Baudelaire sock...whichever. I need to be knitting on holiday and gift items, but I just can't seem to make myself get there. Hopefully by the end of the week I'll make some progress on something other than a sock.

Friday, November 30, 2007

Success!

I finally was able to turn the heel on the Baudelaire. That was this morning. It finally clicked for me...all hail Cookie A., Queen of the Socks! For whatever reason, it wasn't working for me yesterday. I was taking too many of the directions and adding them together.

I'm hoping the Baby I.Q. Afghan will have some progress this weekend. I was going to see my friend yesterday, but her little one had a touch of jaundice, so they were heading to the doctor instead. I hope that when I get over to her place, the blanket will be done.

I still need to finish Sheldon for another friend. I also have a Christmas present on the needles, and plans for at least one more. I'd like to get 2 more done, but that might be pushing it. We'll see what gets done.

Tuesday, November 27, 2007

Creativity

I've been in a creative mode, or trying to be. Is that contradictory? In any case, last night I started writing. I think I'm trying to create from what I have. There are so many projects lying around the house waiting for me to get started, or get finishing. In any case, I'm hoping to get some things accomplished, instead of looking for something new to start. I have cross-stitch, crochet, knit, and sewing/quilting projects to work on, and hopefully I can get some of them finished. I also hope to incorporate some painting, drawing, cooking, baking, and writing into the mix.

My friend had her son yesterday, so the Baby I.Q. Afghan is needed quickly. Guess what I'll be working on for the next couple of days?! I hope I can get it done this week! I don't know how so many people get so much done and flip FOs off their needles with such speed! Do they work outside the home? If I worked at home, I could be making stuff all the time. Even just one day a week would propel my knitting and crocheting into a whole new dimension.

I think I'm going to go with Renee, and try to Pay It Forward. Here's the deal:


The idea of the exchange is I will send a handmade gift to the first 3 people who leave a comment on this blog post requesting to join this PIF exchange. I don’t know what that gift will be yet, and you may not receive it tomorrow or next week, but you will receive it within 365 days, that is my promise (probably sooner rather than later however)! The only thing you have to do in return is pay it forward by making the same promise on your blog - this means you must have a blog, sorry blogless readers.


Enjoy!

Monday, November 26, 2007

Blech...

That's the best way to describe the weather around here. It's cold, wet and rainy. I've been knitting on the Baudelaire sock. It's coming along fairly well. I'm up to the gusset on the sock. I might be able to finish it this week, and hopefully I can finish another project this week as well, or at least half of it. My friend is being induced today, so I should probably get cracking on her second son's blanket. I also saw some friends at church who had a baby girl back in September. I havea to finish the Sheldon for her as well. Now that I've changed sock patterns, the needles I was using for Sheldon are available again. Maybe before Christmas I'll have some FOs to show.

Monday, November 19, 2007

Sick Baby

I was home all weekend, with a sick baby. I did get one more square done for the Baby I.Q. Afghan for a friend who's due December 1st, but decided to be induced November 26th. She completely messed up my schedule...argh...now I havea week less to finish it. :) No biggie...it'll be done in time. If it's not done when she actually delivers, I'll run it by their house soon after she's home. I'm thinking maybe stopping by and delivering dinner too would be nice. One night when neither she or her husband have to worry about what's for dinner and taking care of 3 little ones. I love my crock pot...and left overs. It's amazing what you can do with some leftovers and a little ingenuity. I might get some more done on the afghan today if I can keep my eyes open. Little man wouldn't sleep soundly last night until I held him for a couple of hours. That means Mommy is sleepy today.

Friday, November 16, 2007

Catch-up

Well, I repaired the Baby I.Q. Afghan for my baby...for some reason some of the seams have a tendency to come out. I fixed that. I also trimmed it...fringe was sprouting. I also started on the heel for the Black Diamond Sock; I have 3 or 4 rows left. I think next year I'm going to try and do one pair of socks a month. Then, I'll have 12 pairs of socks at the end of the year. Of course, I probably won't have any other projects done. I'm trying to use up all the yarn I have. I have some projects in queue, and I hope to get them finished before too long. I have lots of bits and pieces that will probably get put in an afghan.

Thursday, November 15, 2007

Bad knitter...no cookie!

I did nothing last night on the Black Diamond sock. I'm a terrible knitter. I went to bed early. Today, I've been working on crochet squares for the Baby I.Q. Afghan for a friend who's due in December. I should be able to easily get it done by December 1, which is when she's due.

I've been listening to Lime & Violet (hence the title), and now I'm curious about spinning. I've checked out a few places online, and even looked at a few classes in some shops around town. I would like to talk to a spinner before I get started in it, and watch a spinner. Maybe I'll check out the local SNB and see if there's a spinner working there.

Tuesday, October 23, 2007

No progress again

I wish somehow that I didn't need sleep. If I didn't, I could get SO much more done. I have worked on the Cromarty, and I've worked on the crocheted baby blanket. I haven't picked up the Baby I.Q. afghans yet, but I did get more yarn for them. I think this weekend I can get more progress done since we're headed up to Toccoa for the weekend. That will mean knitting and crocheting time in abundance for me. I don't have to clean house (can't since we won't be there) and Sweet Baby Boy will be taken care of by the grandparents. That means my hands will be empty (yay!). Of course I want to take care of my baby, but I don't have to do it all. The grandparents can take over and feed, water and change his cage...I mean diaper. :)