I'm trying to have a finishpalooza, and if I would stop starting new projects, I could probably get more done. I did finish Clapotis this weekend (although it could use blocking and I have blocking pins downstairs somewhere in the abyss that is the craft room, the spare bedroom floor isn't in the condition necessary to block anything, so I'm stuck just wearing it unblocked and I LURVE it), and I have to say, I LOVE this pattern. I can definitely see why it was such a hit about 3 years ago. Again, sometimes I'm a little slow on the uptake. I hope to knit this one again in a red/black/grey colorway to the pattern specs, rather than making it longer and narrower than the original.
Tonight I'm hoping to finish the edging on JHAC's Baby I.Q. Afghan tonight, and then there will just be the sewing in ends part. That takes what feels like forever, but it has to be done. After that, I need to finish Sheldon (the newest Knit Night project).
I'm trying to be good and purchase more yarn or start a new project...but I did purchase a new book this weekend! I found a copy of Knitting Without Tears on the shelf (this NEVER happens...it's always an ordered book! - at least for me it is. I never luck into these things). So I definitely picked it up. I am coming into the EZ love ring. :) Once I can find Knitting Workshop (I'm thinking I'm going to hit my LYS up for this one...I think Debi carries it regularly, and doesn't have to order it). I know I've seen the DVD there, so I'm pretty sure she has the book too. I also picked up the latest Interweave Knits. I haven't looked at it in detail (I just skimmed it when I got home on Saturday) but I'm kind of "eh" on the changes. I do miss the lack of men's patterns. Of course, since I have so many men to knit for, I like to have options.
Showing posts with label knit night. Show all posts
Showing posts with label knit night. Show all posts
Monday, March 31, 2008
Wednesday, March 26, 2008
Evil Baking Genius
I was evil...and I did bake. The genius part, well, that's up for debate. I took Chocolate Toffee Bars to Knit Night last night, and I only brought home 3. My hubby finished those off. I don't think it was too bad. :)
In knitting, I'm chugging along on my Clapotis, and I'm over halfway done. I was hoping to have it finished by Easter (and my birthday), but that just didn't happen. Nonetheless, it's still in progress. I STILL haven't finished the Baby I.Q. Afghan (I'm close, but no cigar) and I still have to sew on snaps to the Classic Cardigan. Sheldon isn't moving very far either. And here I am, starting a new project. I'm toying with double knit socks...knitting both socks at the same time, one inside the other, from the toe up. I figured out how they HAVE to start, and now it's just a matter of getting the toddler socks completed, directions written up and test-knitted. I think I can find some test knitters for that. That's all for now...I'm going to grab a pattern and get started on those socks.
In knitting, I'm chugging along on my Clapotis, and I'm over halfway done. I was hoping to have it finished by Easter (and my birthday), but that just didn't happen. Nonetheless, it's still in progress. I STILL haven't finished the Baby I.Q. Afghan (I'm close, but no cigar) and I still have to sew on snaps to the Classic Cardigan. Sheldon isn't moving very far either. And here I am, starting a new project. I'm toying with double knit socks...knitting both socks at the same time, one inside the other, from the toe up. I figured out how they HAVE to start, and now it's just a matter of getting the toddler socks completed, directions written up and test-knitted. I think I can find some test knitters for that. That's all for now...I'm going to grab a pattern and get started on those socks.
Labels:
Baby I.Q. Afghan,
Clapotis,
Classic Cardigan,
knit night,
knitting,
Sheldon
Thursday, March 06, 2008
This week with insanity
It's been a crazy week, and I keep getting crazy ideas. I finished the Classic Cardigan, with the exception of buttons...pictures coming soon (hopefully after buttons are sewn on). There's Super Secret Knitting Project #1 (SSKP#1) that is done, with the exception of sewing in the ends, and SSKP#2 is well underway. I treated myself to more yarn (according to my nutritionist I should reward myself with NON-FOOD items, and yarn is in that category - a mouthful of angora just isn't pleasant) and added some for my birthday as well (yay me!). I did make it to Knit Night this week, and had a really good time.
I also saw this post and decided to try to recreate the Starbucks pastry formerly known as "Heath Bars" (we also called them "Health Bars" because what's healthier than chocolate and toffee in a cookie bar?). I started with trying to make toffee last night...and burned it. Yep, the house was filled with smoke and smelt of burnt sugar. It was not happy. Fortunately, all that I lost was a little time (very little) and some butter and sugar. It was worse than the misfortune with the 7-up cake, but completely inedible. I think the times were off in comparison to the recipe. It said to cook it for 10 minutes, and I did. I didn't use a candy thermometer, which is my fault...but I don't have one. I'm attempting it again tonight, mainly because I'm trying to do the toffee before the rain gets here (tomorrow). Humidity always reeks havoc with candy, so I'm trying to avoid that.
I also saw this post and decided to try to recreate the Starbucks pastry formerly known as "Heath Bars" (we also called them "Health Bars" because what's healthier than chocolate and toffee in a cookie bar?). I started with trying to make toffee last night...and burned it. Yep, the house was filled with smoke and smelt of burnt sugar. It was not happy. Fortunately, all that I lost was a little time (very little) and some butter and sugar. It was worse than the misfortune with the 7-up cake, but completely inedible. I think the times were off in comparison to the recipe. It said to cook it for 10 minutes, and I did. I didn't use a candy thermometer, which is my fault...but I don't have one. I'm attempting it again tonight, mainly because I'm trying to do the toffee before the rain gets here (tomorrow). Humidity always reeks havoc with candy, so I'm trying to avoid that.
Labels:
baking,
Classic Cardigan,
knit night,
knitting,
Pay It Forward
Wednesday, January 23, 2008
More Progress
I finished all the squares for the Baby I.Q. Afghan. Now for the seaming. I'm going to try seaming 4 squares at once instead of just 2 at a time. I'm also going to pass back through the corners to double the seam and hopefully it won't have holes.
I picked up my second Sheldon again this week, after finishing all the squares for the afghan. I'm over halfway done with his body, which is nice. I'll have to pull up some fiberfill for it later this week, or at least by Saturday. I'm somewhere in the 60s for rounds, and you stuff it in round 80. Since they are short rounds, it won't take long.
I have also made progress on the Classic Cardigan for my son by Debbie Bliss. Knit Night at TWNY helps TREMENDOUSLY. I love hanging out with the folks over there...it's fun to listen and see what others are doing. I must say, sometimes it's rather disheartening to see people only making a scarf or a hat out of plain yarn with no pattern to it. I kow the important thing is that they're knitting, but to always see scarves is just...boring to me. I hear and see such great projects online that others are doing, and I go, hoping that someone will astonish me with their mad knitting skilz. It just hasn't happened yet. Maybe before the end of the year, it will. Or, maybe I'll be that Crazy Mad Knitter and become a knitting goddess before too long. It all depends on how soon I finish some other projects.
I'm having committment issues with my projects. I'm trying to finish all of them, and want to pick all of them up and finish them all right now. I'm trying to prioritize, but let's face it...there are only self-imposed deadlines on many of these projects. I'll keep plugging away at them, little by little. Slowly and steadily, they'll all get done.
I picked up my second Sheldon again this week, after finishing all the squares for the afghan. I'm over halfway done with his body, which is nice. I'll have to pull up some fiberfill for it later this week, or at least by Saturday. I'm somewhere in the 60s for rounds, and you stuff it in round 80. Since they are short rounds, it won't take long.
I have also made progress on the Classic Cardigan for my son by Debbie Bliss. Knit Night at TWNY helps TREMENDOUSLY. I love hanging out with the folks over there...it's fun to listen and see what others are doing. I must say, sometimes it's rather disheartening to see people only making a scarf or a hat out of plain yarn with no pattern to it. I kow the important thing is that they're knitting, but to always see scarves is just...boring to me. I hear and see such great projects online that others are doing, and I go, hoping that someone will astonish me with their mad knitting skilz. It just hasn't happened yet. Maybe before the end of the year, it will. Or, maybe I'll be that Crazy Mad Knitter and become a knitting goddess before too long. It all depends on how soon I finish some other projects.
I'm having committment issues with my projects. I'm trying to finish all of them, and want to pick all of them up and finish them all right now. I'm trying to prioritize, but let's face it...there are only self-imposed deadlines on many of these projects. I'll keep plugging away at them, little by little. Slowly and steadily, they'll all get done.
Labels:
Baby I.Q. Afghan,
Classic Cardigan,
knit night,
knitting,
projects,
Sheldon
Monday, January 14, 2008
Above and Beyond
I have so many projects that I already have underway and want to complete by the end of the year! How am I ever going to make time and get them all done?! Well, one of the first things I'm trying to do is become a regular at my LYS knit night. I've been going to The Whole Nine Yarns in downtown Woodstock for 2 weeks, and so far so good. Even if I only stay an hour, it's time away from home where I can focus on knitting. Next, I'm trying to get as many errands done during the week on my way home as possible, so I don't have to do them on the weekends. This means hopefully I can focus more on crafting then as well. I'm going to bring my sewing machine upstairs so I can use it (it's a little too cold right now to be sitting downstairs with no heat!) and hopefully I can even put Little Man in there with me and let him play while Mommy sews. I have figured out a pattern for a quilt...although I'll still be fine-tuning it. I think it will work out nicely, and if I am smart about when I buy the fabric, it shouldn't be that expensive either. I'm trying to base it off of one fat quarter I have that I really want to showcase. Unfortunately, I only have one, and I don't know if I can find the fabric again. Oh well...back to day-dreaming!
Subscribe to:
Posts (Atom)